Fire Safety:
The following activities and sequences will be followed in this project:
- Provide or verify the full set of existing Design & Drawing (if any) related to fire safety and compliance issue according to BNBC, NFPA, ACCORD, and Alliance & NI (National Initiative by ILO & DIFE)
- Review and provide the suggestions for preparation of all the compliance documents.
- To solve all the non-compliance issue physically and documentarily.
- Provide all Firefighting schemes drawing according to BNBC, NFPA, ACCORD, Alliance & NI (National Initiative by ILO & DIFE) standard.
- Provide all Fire detection and alarm system Design & Drawing according to BNBC, NFPA, ACCORD, Alliance & NI (National Initiative by ILO & DIFE) standard with Schematic Diagram.
- Suggestion of how to keep/maintain the documents & program schemes for testing and inspection of the materials like extinguisher, smoke detector, fire door, fire alarm system, emergency light etc.
- Provide the design of the required rated construction barrier (if needed).
- Provide the report and suggest for the optimized solution for each CAP (Corrective Action Plan) management of overall fire safety system according with existing condition.
- Feasibility study of the development (upon existing ailment of the factory & refer to the responsible person).
Deliverables:
- Fire detection and alarm system Design, Drawing Installation with Schematic Diagram.
- Fire Hydrant System Drawing Installation.
- As-Built Machine Layout Plan.
- All maintenance documents.
- All Training documents.