Fire Safety:

The following activities and sequences will be followed in this project:

  • Provide or verify the full set of existing Design & Drawing (if any) related to fire safety and compliance issue according to BNBC, NFPA, ACCORD, and Alliance & NI (National Initiative by ILO & DIFE)
  • Review and provide the suggestions for preparation of all the compliance documents.
  • To solve all the non-compliance issue physically and documentarily.
  • Provide all Firefighting schemes drawing according to BNBC, NFPA, ACCORD, Alliance & NI (National Initiative by ILO & DIFE) standard.
  • Provide all Fire detection and alarm system Design & Drawing according to BNBC, NFPA, ACCORD, Alliance & NI (National Initiative by ILO & DIFE) standard with Schematic Diagram.
  • Suggestion of how to keep/maintain the documents & program schemes for testing and  inspection of the materials like extinguisher, smoke detector, fire door, fire alarm system, emergency light etc.
  • Provide the design of the required rated construction barrier (if needed).
  • Provide the report and suggest for the optimized solution for each CAP (Corrective Action Plan) management of overall fire safety system according with existing condition.
  • Feasibility study of the development (upon existing ailment of the factory & refer to the responsible person).

Deliverables:

  • Fire detection and alarm system Design, Drawing Installation with Schematic Diagram.
  • Fire Hydrant System Drawing Installation.
  • As-Built Machine Layout Plan.
  • All maintenance documents.
  • All Training documents.